“Made in Ansteel”supported Beijing-Shenyang High-speed Railway Liaoning Section to open to the traffic

 2019-01-03

 

On December 29, 2018, Beijing-Shenyang High-speed Railway Liaoning Section opened to the traffic. This is an important dedicated passenger line of railway terminal which will connect Beijing with Shenyang. The railway is stamped with “Made in Ansteel”. As the sole supplier, Ansteel supplied 71000t rails to Liaoning section. 50000t high-quality pre-stressed steel was applied to 85% rail concrete bearing beam of Beijing-Shenyang High-speed Railway.

 
 
©2017 China Ansteel Group Corporation Limited.Liao ICP Bei No.05004580